
MIL-C-21522(Wep)
Special Test Equipment - The following items
4.4
of special test equipment are required to perform the
acceptance tests set-forth in this specification.
Operational Test Setup
SA-2440175
for Liquid Springs
Pneumatic High Pressure
SA-2440366
Test
Vibration Test Fixture
SA-2440493
for Lockout Cylinder
and Liquid Springs
Shock Test Fixture
SA-2619427
Support System Component
SA-2619682
Fixture
Production Tests
4.5
Responsibility - The contractor or Government
4.5.1
Inspector shall conduct production tests as specified in
4.3.1 to assure that the lockout cylinder is in compliance
wiith the requirements of 3.3.1 through 3.3.3.
Test Conditions - Unless otherwise specified
4.5.2
the lockout cylinders shall be subjected to production
tests under the following conditions:
Room ambient, +65 to +100
Temperature:
degrees Fahrenheit
Pressure:
Not to exceed 1/4 g acceleration
Vibration:
Relative humidity of 100 percent
Humidity:
or less
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business