MIL-B-21518A (Wep)
4.3*3
Tests After Delivery - Unless otherwise spec-
ified in the contract, the Government reserves the right
to conduct any or all of the tests specified herein as
deemed necessary after installation of the flexible-bellows
assembly. Any defects discovered before, during, or after
these tests, due to the contractor's failure to comply with
drawings or specifications for this equipment, shall-be
corrected by the contractor at no expense to the Governmentj
provided the contractor is notified of such defects within
the guarantee period of the contract.
4.4
Special Test Equipment - The following items
of special test equipment are required to perform the
acceptance tests set forth in this specification:
SA-2440165
Hydrotest Fixture for Flexible
Bellows
SA-2440203
Life Testing Fixture for Upper
and Lower Seals (Also used for
bellows)
SA-2440379
Corrosion Test
SA-2440482
Bellows Submergence Test
4.5
Production Tests
4.5.1
Responsibility - The contractor or Government
Inspector shall perform production tests as specified in
4.3.1 to assure that the flexible-bellows assembly is in
compliance with the requirements of 3.3.1 and 3.3.3.
4.5.2
Test Conditions - Unless otherwise specified,
the flexible-bellows assembly shall be subjected to pro-
duction tests under the following conditions:
Temperature:
Room ambient, +65 to +85 degrees
Fahrenheit
Altitude:
Normal, ground atmospheric pressure
Vibration:
None
Humidity:
Room ambient