MIL-S-21520C (Wep)
Tests After Delivery - Unless otherwise speci-
4.3.3
fied in the contract, the Government reserves the right to
conduct any or all of the tests specified herein as deemed
necessary after installation of the upper and lower seals.
Any defects discovered before, during, or after these
tests, due to the contractor's failure to comply with
drawings or specifications for this equipment, shall be
corrected by the contractor at no expense to the Govern-
ment, provided the contractor is notified of such defects
within the guarantee period of the contract.
4.4
Special-Test Equipment - The following items
or special test equipment are required to perform the
acceptance tests as set forth in the specification:
Endurance Test Fixture
SA-2440203
Lower Seal Test Fixture
SA-2619377
Upper Seal Test Fixture
SA-2619378
Production Tests
4.5
Responsibility - The contractor or Government
4.5.1
Inspector shall perform production tests as specified in
paragraph 4.3.1 to assure that the intertube seals are in
compliance with the requirements of 3.3.1.
Test Conditions - Unless otherwise specified,
4.5.2
the intertube seals shall be subjected to production
tests under the following conditions:
Room ambient, +65 to
Temperature:
+85 degrees Fahrenheit
Normal, ground atmos-
Altitude:
pheric pressure
None
Vibration:
Room ambient
Humidity:
- 10 -